Colorado’s top choice for all things concrete

CASE STUDIES

Full-service construction solutions, from pre-construction planning to final walkthroughs, ensuring project success from day one.

Case Studies

Our case studies highlight what we do best: solving construction challenges with smart planning, modern equipment, and highly skilled teams.

Weidner Field

A Stadium Built on Precision and Performance
As the home of the Colorado Springs Switchbacks FC, Weidner Field demanded excellence at every stage. ARACO GROUP delivered high-performance concrete solutions under tight deadlines and exacting standards. From structural pours to architectural finishes, our team ensured this iconic venue foundation was built to endure and inspire.

Ford Amphitheater

The Ford Amphitheater opened on Aug. 9, 2024. 

A privately funded venue, the 8,000-seat outdoor amphitheater for live, major musical acts is located on approximately 10 acres in Polaris Pointe in northern Colorado Springs. It is owned by Colorado Springs based, Venu Holding Corporation, formerly Notes Live, and operated in partnership by AEG Presents Rocky Mountains. The Ford Amphitheater is a $90 million entertainment complex that hosts a minimum of 35 scheduled events per year. These events are projected to generate $102 million annually in economic impact, equating to nearly $1 billion over the next decade.

Size….. 

Marksheffel Water Main Installation

More than 18,000 feet of water main along Marksheffel Road. between Peterson Space Force Base’s East Gate and Drennan Road. This water construction project will improve water service reliability and water system redundancy. The 30-inch and 24-inch water mains will be installed over a period of about 14 months, with the first phase lasting from December 2024 to early January 2025. The project is anticipated to be completed in 2026. Araco Group LLC poured the base concrete foundation for the project …. year….

UCCS Alpine Village

Araco’s Work for UCCS Alpine Village Retaining Wall for Kiewitt

One of the first Design-Build projects for the University and the campus’ largest project to date. Kiewit constructed a two-phase, four-building, mixed-use Village that features three residence halls and a signature dining hall with a multi-venue platform, late night grill, scratch bakery, and a multi-purpose conference/venue space. The residence halls feature large community lounge areas on each floor to foster connections to other students and to nature with views of Pikes Peak and Garden of the Gods.

The Residence Halls (La Plata, Cucharas, and San Juan) provide academic, classrooms designed to accommodate in-house lectures, summer camps, conferences, and housing for freshmans and transfers.

Source

 

Top-notch performance & delivered on time!

Araco Concrete is your trusted partner for complete concrete solutions in Colorado. Whether you need commercial flatwork, custom multifamily pours, or industrial-grade slabs, we bring decades of expertise, modern equipment, and a commitment to excellence on every jobsite.

Support

Our dedicated support team at our main office is available to help you during the following hours.

Monday-Friday: 8:00 am to 4:00 pm
Saturday and Sunday: Closed

Contact

(719) 576-1705

Projects

Offices

Main Headquarters

3390 Drennan Industrial Loop S
Colorado Springs, CO 80910
(719) 576-1705
info@aracogroupllc.com

North Location

987 US Highway 85
Brighton, CO 80603
(719) 576-1705
info@aracogroupllc.com

 

Copyright © 2025 Araco Group LLC